Uganda your prefered investment destination in Africa .

Selected Factor Costs
a) Proposed Infrastructure
Underlying assumptions are:
• Rain water will be collected on site and stored for use by the plant;
• A borehole will also be sunk on site for additional water;
• The plant will have its own waste disposal facility that will include a septic tank and soak pit;
• All waste will be treated and neutralized on site; and
• Electricity tariffs will get lower by 2012 when a new 250MW Bujagali Hydro Power Station is commissioned and oil drilling in Western Uganda will have commenced.

b) Selected Indicative Infrastructure Costs

c) Estimated Utilities Costs for the 1st Year of Production

 d) Proposed Labour Costs
Underlying assumptions are:
• Proposed rates include health benefits, taxes and social security contributions;
• All administrative and production management personnel are available locally; and
• Only more unskilled labourers will be required with increased capacity utilization of the ginnery.

Quick Menu

Video Gallery

Photo Gallery

Quick Contacts

The Investment Centre,Plot 22B Lumumba Avenue,
TWED Plaza
P.O. Box 7418 Kampala, Uganda
Tel:    +256-414-301000
E-mail:   info@ugandainvest.go.ug